Social Housing
Ladas Way Residential Development
The scope of works included the demolition of existing pavilion, site clearance, the construction of 16 No. two storey general needs dwellings, car parking and all soft and hard landscaping.
For 14 No. dwellings the construction includes trench fill foundations and bottom driven, low vibration mini piles for 2No. dwellings, load bearing external walls suspended precast concrete hollowcore ground floor slabs, timber suspended first floor, load bearing and non bearing internal walls, and trussed rafter roof. The external walls are facing brick/block in cavity construction, windows are double glazed UPVC and the external doors and frames are hardwood. The roof is covered with concrete interlocking tiles.
Client: Trinity Housing Association
Value: £1,240,000
Start Date: February 2010
Construction Period: 52 weeks
Architect: John Williamson Architect
Quantity Surveyor: Andrew G Crawford & Company
Structural Engineer: Savage Associates
Service Engineer: R&H Design
Other Social Housing Projects:
Ladas Way Residential Development
Dairy Court, Falls Rd, Belfast
Former Inbev Brewery Site, Glen Road